The contract is for the replacement of a failing septic system at 1050 San Raphael Dr. in Akron, Ohio. The contractor will be required to install an NPDES compliant aerobic treatment unit that is capable of treating at least 360 gallons per day. The contractor must also abandon the existing system in accordance with the Summit County Environmental Health code. The contract requires the contractor to carry a minimum of $2,000,000 of General Commercial Liability Insurance and $1,000,000 of Commercial Auto Liability. The contractor must also list the County of Summit as an additional insured on their policy. The contract is subject to Davis Bacon wage rates. Some key points about the contract include:
• The contractor must attend a mandatory pre-bid meeting to submit a bid.
• The contractor must visit the site prior to the pre-bid meeting and arrange a time with the homeowner.
• The contractor must have a current registration, bond, and insurance on file with the appropriate jurisdictions building department and Summit County Health District.
• The contractor must provide all warranties to the homeowner prior to final payment.
• The contractor must inspect the interior of the unit to ensure all plumbing is connected in accordance with the Summit County Environmental Health code.