The contract is for the replacement of aging water system infrastructure, including the installation of approximately 1,910 linear feet of eight-inch ductile iron water main and associated fittings. The project also includes the installation of three new fire hydrant assemblies and appurtenances, one new water quality sampling station, and other related work. The engineer's estimate for the project is $735,225.00. The contract was awarded to D & G Backhoe Inc. in the amount of $546,508.49, plus tax.
• The project location is near Lake Stevens, in Snohomish County, Washington.
• The project includes asphalt trench patching, asphalt restoration overlay, driveway removal and in-kind restoration, roadway striping, erosion control, and landscape/surface restoration.
• The primary purpose of the proposed project is to replace aging water system infrastructure.
• Construction shall be performed while maintaining service to the existing water system.