The City of Palm Bay issued a Request for Proposal (RFP) for the Wild Rose Stormwater Improvements project. The project involves the removal of an existing outfall pipe and installation of a Continuous Deflection Separation unit, as well as the installation of 164 linear feet of 18” pipe to Turkey Creek. The work includes the restoration of the project area to a condition equal to or greater than existing. The RFP was posted on October 11, 2010, and the bid submission date was November 9, 2010. A pre-bid conference was held on November 2, 2010. The Evaluation Committee met on December 17, 2010, to discuss and short-list contractors for the project.
• The project involves stormwater improvements in the Wild Rose area of Palm Bay, Florida.
• The RFP was issued by the City of Palm Bay.
• The project includes the installation of a Continuous Deflection Separation unit and 164 linear feet of 18” pipe.
• The work includes the restoration of the project area to a condition equal to or greater than existing.
• A pre-bid conference was held on November 2, 2010.
• The Evaluation Committee met on December 17, 2010, to discuss and short-list contractors for the project.