The contract is for the replacement of an existing ductile iron water main with HDPE along Glacier Highway from near Point Lena Loop Road to approximately Milepost 16.5. The work includes reconnection to existing service legs, erosion and sediment control, traffic control, removal and replacement of fire hydrants and asphalt pads, hydroseed, and other miscellaneous related work. The contract was awarded to North40 Construction Corp for a total bid of $661,000.00. The project is located in Juneau, Alaska, and the City & Borough of Juneau is the contracting agency. Key aspects of the project include:
• Replacement of existing water main with HDPE
• Reconnection to existing service legs
• Erosion and sediment control
• Traffic control
• Removal and replacement of fire hydrants and asphalt pads
• Hydroseed and other miscellaneous related work
The contract is a fixed-price contract, and the award was made based on the lowest responsive bid.