Based on the contract description, the total value of the contract is estimated to be around $6,000,000. This estimate is based on the total bid with trades for the sanders, which ranged from $257,824.00 to $274,732.00, and the fact that the contract includes the purchase of other equipment, such as a regenerative air street sweeper and a tandem dump truck. The total bid for the sweeper ranged from $203,050.00 to $207,831.00, and the total bid for the dump truck ranged from $124,860.00 to $131,206.00. Additionally, the contract includes the purchase of other equipment, such as the Nordby Lane Reconstruction project, which had a total bid of $1,547,608.65 to $1,876,436.45, and the Longview Road Water Transmission Main Extension project, which had a total bid of $1,856,566.00 to $2,351,000.00.