This contract awards the complete relocation of water, sewer, and irrigation utilities along Crosby Avenue in Grand Junction, Colorado. The scope includes removal of existing water mains (4”, 6”, 8”) and casing pipe, installation of new PVC water mains, installation of epoxy‑coated valves and fittings, trench backfill, site restoration, and associated civil works such as erosion control, traffic control, and surveying. The awarded bid, submitted by Sorter Construction Inc., totals $1,049,077.30 and meets all bid‑bond, signed‑form, and addenda acknowledgement requirements. The project follows CDOT specifications and incorporates detailed unit‑price breakdowns for each material and labor item.
• Comprehensive utility relocation covering water, sewer, and irrigation systems.
• Detailed unit‑price schedule for pipes, valves, fittings, and ancillary site‑work items.
• Awarded to Sorter Construction Inc. at a total bid of just over $1.05 M.