The contract is for the Bay County EOC Water Line Utility Mitigation project, which involves providing a secondary water line connection from the Bay County Water Booster Station to the Bay County Emergency Operations Center building. The project consists of approximately 330 linear feet of 12-inch water main and 160 linear feet of horizontal directional drilling. The contract was awarded to 850 Construction Services LLC, and the project is funded by the Hazard Mitigation Grant Program (HMGP) and the Community Development Block Grant (CDBG) program. The contract includes provisions for insurance, bonds, and indemnification, as well as requirements for compliance with federal and state laws. Key aspects of the contract include:
• The contract duration is 180 calendar days.
• The contract price is $531,907.03.
• The vendor is required to provide proof of compliance with federal and state laws.
• The contract includes provisions for termination for cause and convenience.
• The vendor is required to maintain insurance and comply with Bay County Insurance Requirements.
• The contract includes a hold harmless and indemnification clause.
• The vendor is required to comply with the Prevailing Minimum Wage obtained at https://sam.gov/content/wage-determinations.