This contract concerns the renovation and upgrade of the water pump station at Reservoir No. 6 of the Metropolitan District’s Water Treatment Facility in West Hartford, CT. The scope includes demolition of existing equipment, replacement of booster pumps, variable‑frequency drives, discharge and suction piping, valves, HVAC upgrades, electrical and instrumentation upgrades, and associated site work. The project requires the contractor to hold a current DAS Contractor Prequalification Certificate for water treatment plants and to submit a 10 % bid security. A mandatory pre‑bid conference and site tour were held on 24 January 2019, and questions were due by 31 January 2019. Bids were due 15 February 2019, and the contract was awarded on 9 May 2019.
• Scope: Complete mechanical, electrical, and control system replacement for an existing pump station.
• Requirements: DAS pre‑qualification, 10 % bid security, attendance at pre‑bid conference, full compliance with CT water‑treatment regulations.
• Timeline: Bidding window Jan 15 – Feb 15 2019; award May 9 2019; no explicit start or end dates disclosed.
Attached files
The award documents live at the source — open the contract source above to download them.