The Montana Department of Transportation (MDT) is requesting bids for septic tank pumping services in the Billings area. The contract period is from September 1, 2025, to August 31, 2026. The contractor will be responsible for pumping out septic tanks at eight locations, including rest areas, a maintenance shop, and an inspection barn. The contractor must provide all labor, equipment, materials, and incidentals necessary to complete the work. The contract requires the contractor to comply with various regulations, including safety and health requirements.
• The contract includes eight locations for septic tank pumping.
• The contractor must pump out septic tanks on an "as needed" basis.
• The contract period is from September 1, 2025, to August 31, 2026.
• The contractor must comply with safety and health requirements.
• The contractor must provide all labor, equipment, materials, and incidentals necessary to complete the work.