The contract is for the replacement of a septic system at a property located at 3636 Stimson Rd. in Norton, Ohio. The project includes the installation of an NPDES compliant aerobic treatment unit, proper abandonment of the existing system, and connection of downspouts. The contractor must also provide all necessary permits and inspections, and ensure that the work is done in accordance with all applicable local building codes and regulations. The contract also requires the contractor to carry a minimum of $2,000,000 in general commercial liability insurance and $1,000,000 in commercial auto liability insurance.
• The contract is subject to Davis Bacon wage rates.
• The contractor must attend a mandatory pre-bid meeting.
• The contractor must visit the site prior to the pre-bid meeting.
• The contractor must provide a copy of each permit and signed off inspection sheet to complete the paperwork for the project.
• The contractor must list the County of Summit as an additional insured on their policy.