Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Airports JOCs 185 186 187 188 189

Awarded contract·County of Sacramento - Construction·California

Airports JOCs 185 186 187 188 189

Won by Outback Contractors, Inc.$1.5MSingle Award
Contract source

Awarded vendors

  • Outback Contractors, Inc.

Description

The contract is for a Job Order Contract (JOC) for the County of Sacramento Department of Airports. The contract includes the furnishing of all labor, materials, and equipment required for the JOC. The contractor will perform tasks required by each individual task order using adjustment factors provided in the contract. The contract has a base period of 365 calendar days and a maximum value of $1,500,000. The contract may be extended or increased in value. Key aspects of the contract include: • The contractor must provide all necessary labor, materials, and equipment for the JOC. • The contract includes a base period of 365 calendar days and a maximum value of $1,500,000. • The contract may be extended or increased in value. • The contractor must use adjustment factors provided in the contract to determine the price of fixed-price task orders. • The contract includes a bid guarantee and a performance bond. Some key points to consider are: • The contract is for a JOC, which means that the contractor will be performing a variety of tasks as needed by the County. • The contract has a base period of 365 calendar days, but it may be extended or increased in value. • The contractor must use adjustment factors provided in the contract to determine the price of fixed-price task orders. • The contract includes a bid guarantee and a performance bond, which provides security for the County in case the contractor fails to perform.

Attached files

Key dates

Duration
365 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
65104

Contract value

$1,500,000

The estimated value of the contract is between $0 and $1,500,000. This estimate is based on the contract document, which states that the estimated construction cost is between $0 and $1,500,000. The actual value of the contract may be higher or lower, depending on the specific tasks and services provided by the contractor. Factors that may influence the contract value include the scope of work, the materials and equipment required, and the labor costs.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Grants·California

Top match · 63%

Local Airport Loan Program

Rolling / TBD closeOpened 6/20/2025

City of Charlotte·North Carolina

61% match

Airport Traffic and Curb Support Services

Rolling / TBD closeOpened 5/15/2026

City of Lawrence·Kansas

61% match

Lawrence Municipal Airport Commercial Aeronautical Hangar Leasing

Closes 11/24/2026Opened 10/26/2026

Gilbert·Arizona

60% match

Parks and Recreation JOC

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Defense·California

60% match

IDIQ JOC All Other Specialty Trades Projects

Closes 11/23/2026Opened 10/27/2026

Jacksonville Aviation Authority·Florida

60% match

ITB C-900 JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

Georgia Turner County Board of Commissioners·Georgia

60% match

Turner County Airport � Apron/Stub Taxiway Rehabilitation Project

Closes 11/17/2026Opened 10/16/2026

Franklin County Board of County Commissioners·Florida

60% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

City of Cleveland·Ohio

60% match

576 - Traffic Signal Maintenance

Closes 11/9/2026Opened 11/14/2025

Jacksonville Aviation Authority·Florida

59% match

JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

City of Redding·California

59% match

5733 - Redding Municipal Airport Rental Car Concession

Closes 11/5/2026Opened 10/2/2026

California Grants·California

59% match

Airport Improvement Program Matching Grant

Rolling / TBD closeOpened 6/20/2025

City of Mankato·Kansas

58% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

U.S. Department Of Defense·California

58% match

General Construction Job Order Contract (JOC)

Closes 11/4/2026Opened 10/28/2026

La Joya ISD·Texas

58% match

Construction Services Job Order Contract (JOC)

Closes 11/6/2026Opened 10/17/2026

County of Okaloosa·Florida

58% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

City of Lawrence·Kansas

58% match

On-Call Planning Consulting Services for Airport Development

Closes 11/24/2026Opened 10/19/2026

County of Colusa·California

58% match

RFP - Commercial Airport Property Lease

Closes 1/11/2027Opened 9/24/2026

City and County of San Francisco·California

58% match

EXT AIR | As-Needed Airport Conveyance Maintenance

Closes 6/30/2029Opened 4/25/2024

San Joaquin County·California

58% match

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026Opened 10/30/2026

City of San Jose·California

58% match

SJC Airport Elevator Replacement

Closes 11/12/2026Opened 9/30/2026

Port of Portland·Oregon

58% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

58% match

Fort Benning Job Order Contract (JOC)

Closes 12/31/2026Opened 4/3/2025

City of Phoenix·Arizona

58% match

Airport Technology Consulting Services

Closes 12/3/2026Opened 10/13/2026

City of Colorado Springs·Colorado

58% match

Elevator & Escalator Maintenance for Colorado Springs Airport

Closes 11/9/2026Opened 10/8/2026