Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›Conceptual Design & Feasibility, Centennial Trail South

Awarded contract·Snohomish County·Washington

Conceptual Design & Feasibility, Centennial Trail South

Won by KPFF, Inc.$1MAwarded 10/3/2025Single Award
Contract source

Awarded vendors

  • KPFF, Inc.

Description

This contract awards a single‑source, lump‑sum agreement to KPFF, Inc. for the conceptual design and feasibility study of the Centennial Trail South project in Snohomish County, Washington. The scope covers project understanding, technical approach, schedule, staffing plan, and references, each weighted for evaluation. The procurement was conducted via an RFQ, with a due date of September 4 2025 and an award recommendation issued on October 3 2025. The contracting agency is the Snohomish County Department of Conservation & Natural Resources. • Scope: Conceptual design and feasibility analysis for a county trail extension, including planning, engineering concepts, and preliminary cost estimates. • Evaluation: Multi‑criteria scoring (project approach 25 pts, references 25 pts, etc.) with KPFF scoring highest (7.75) and selected for award. • Procurement: Single‑award RFQ, full and open competition, award made as a lump‑sum, firm‑fixed‑price arrangement.

Attached files

Key dates

Bids closed
9/4/2025
Intent to award
10/3/2025
Awarded
10/3/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
541330
Solicitation №
RFQ-25-0541BC

Contract value

$1,000,000

The summary does not disclose a contract dollar amount. A conceptual design and feasibility study for a multi‑mile trail in a suburban county typically ranges from a few hundred thousand dollars to low‑single‑digit millions, depending on the level of detail, stakeholder engagement, and geographic complexity. Comparable public‑sector trail feasibility studies in Washington State have been funded at roughly $0.75‑$1.5 million. Considering the likely need for engineering analysis, environmental review, and preliminary cost estimation, a conservative estimate for this contract would be about $1 million. This figure assumes a modest scope (pre‑design only) and reflects typical rates for a firm of KPFF’s size on similar public‑sector projects.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Georgia Cobb County Department of Transportation·Georgia

Top match · 71%

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Delaware Valley Regional Planning Commission·Pennsylvania

71% match

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

City of Cincinnati·Ohio

70% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Cobb County·Georgia

70% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Hutchinson·Kansas

70% match

Request for Proposal Jim Martinez Trail

Closes 11/20/2026Opened 10/26/2026

City of Green Cove Springs·Florida

69% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Georgia Cobb County Department of Transportation·Georgia

69% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

City of Cincinnati·Ohio

69% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Goshen, Indiana·Indiana

68% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

City of Keene·New Hampshire

68% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Maryland Department of Natural Resources·Maryland

68% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Alaska Department of Transportation & Public Facilities·Alaska

68% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Alaska Department of Transportation and Public Facilities·Alaska

67% match

RTP Grant Application - Rehabilitation of Multi-Purpose Trail in Galena

Rolling / TBD closeOpened 9/24/2026

Virginia Department of Transportation·Virginia

67% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

Harris County·Georgia

67% match

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

City of Keene·New Hampshire

67% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Minnesota Department of Administration·Minnesota

67% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

City of Haines City·Florida

67% match

Boomerang Park Nature Trail Project - Design Services

Closes 11/10/2026Opened 10/9/2026

Missouri Department of Transportation·Missouri

67% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Pierce County·Washington

67% match

Pipeline Trail Phase 3 - Architecture and Engineering Services

Closes 11/20/2026Opened 10/30/2026

City of Gainesville - Procurement Division·Florida

67% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Georgia Liberty County Board of Commissioners·Georgia

66% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

City of Maryville·Missouri

66% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

Illinois Natural Resources·Illinois

66% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

Missouri Department of Transportation·Missouri

66% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026