This contract is a competitive sealed‑bid award for the renovation of an existing office space into a conference room within the administration area of Appleton International Airport. The scope includes demolition of interior finishes, installation of new HVAC, plumbing, electrical, fire‑sprinkler, and low‑voltage technology systems, as well as interior fit‑out (casework, doors, finishes) and coordination with existing airport infrastructure. RJM Construction was selected as the low‑bid winner at $111,100, and must provide a 5 % bid bond, performance and payment bonds, and meet extensive insurance and indemnification requirements. The project must be substantially completed by September 1 2026 with liquidated damages of $100 per day for any delay.
• Demolition, protection of existing structural elements, and full MEP installation per the ATW “Admin Conf Room” drawings.
• Mandatory site visit on May 6 2026; bid submission deadline May 19 2026, award on June 3 2026.
• Contract governed by AIA A101‑2017 (Stipulated Sum) and AIA A201‑2017 General Conditions, with strict bonding, insurance, and indemnity clauses.