The City of Olathe is seeking bids for the construction of a Lime Residuals Storage Facility and Sludge Pump Station Modifications. The project includes the construction of a storage facility with a capacity of approximately 250,000 cubic yards, and modifications to the Sludge Pump Station. The successful bidder will be required to furnish and pay for satisfactory performance and statutory bonds. The bid documents and drawings can be downloaded from the City of Olathe's website. Some key points to note are:
• The project requires a minimum of five years of similar construction experience.
• A pre-bid conference was held on February 13, 2014, at 10:00 a.m. at Water Plant 2, 27065 W. 83rd St., Lenexa, KS.
• The bid opening date was February 25, 2014, at 2:00 p.m. local time.
• The City of Olathe reserves the right to reject any or all bids.