This contract is for the replacement of automatic transfer switches at the Mead Building, located at 421 SW 5th Ave, Portland, OR 97204. The contract was awarded to SQUIRES ELECTRIC, INC, with a bid amount of $160,970.00. The contract requires the contractor to apply route optimization strategies, recycle and reuse materials, and include diverse suppliers in their supply chain. The contract also requires the payment of prevailing wages, as set forth in the Prevailing Wage Rates on Public Works Contracts in Oregon.
• The contract includes a mandatory pre-bid conference and walkthrough, which were held on September 15, 2021.
• The contract requires the submission of a bid bond and performance and payment bonds.
• The contract is subject to the terms and conditions outlined in the contract documents, including the project manual and drawings.
• The contract requires the contractor to comply with responsible business practices, including reducing waste and promoting diversity in their supply chain.