The contract is for the Crossroads Park Phase I - Grading & Utilities project, which includes mass grading of the park sites, water and wastewater utilities, wastewater trunk sewer, culvert drainage structures, drainage structures, erosion control, revegetation, underground conduit, and other miscellaneous items. The contract was awarded through an Invitation to Bid (ITB) process, and the bidders were required to submit their bids by November 4, 2016. The contract has three parts: Part A (Crossroads Detention Pond), Part B (Crossroads Park), and Part C (Wastewater Trunk Line). The total base bid for each bidder is listed, as well as the price for an alternate (Pond Vegetation Alternate). The contract also includes requirements for bid bonds, bond requirement affidavits, and credit check authorizations.
• The contract is for a construction project in Texas.
• The project includes grading, utilities, and other miscellaneous items.
• The contract was awarded through an ITB process.
• The bidders were required to submit their bids by November 4, 2016.
• The contract has three parts: Part A, Part B, and Part C.
• The total base bid for each bidder is listed.
• The contract includes requirements for bid bonds, bond requirement affidavits, and credit check authorizations.