The contract is for the replacement of 2 non-portable service water pumps, original to the plant and installed in 1985. The project funds engineering for pump replacement design and installation of new pumping system. The contract was bid on by 5 companies, with bids ranging from $389,000 to $527,558. The contract is expected to be awarded to one or more of these companies, but the exact awardee(s) are not specified. Key aspects of the contract include the replacement of the water pumps, engineering for pump replacement design, and installation of a new pumping system. The contract also involves a pre-bid conference and the submission of bids. The project is funded by the City of Keene, and the contract is subject to the city's purchasing procedures.
• The contract is for the replacement of 2 non-portable service water pumps.
• The project funds engineering for pump replacement design and installation of new pumping system.
• The contract was bid on by 5 companies, with bids ranging from $389,000 to $527,558.
• The contract is expected to be awarded to one or more of these companies.
• The contract involves a pre-bid conference and the submission of bids.
• The project is funded by the City of Keene.
• The contract is subject to the city's purchasing procedures.