The contract is for the replacement of the main irrigation valve at Laguna Niguel Park. The scope of work includes site demo, irrigation installation, and backfilling. The contract amount is $41,197.30, and the duration is 120 calendar days from the date of issuance of the Notice to Proceed. The contractor is required to pay prevailing wages and maintain records for all costs connected with the performance of the contract. The contract also includes provisions for changes, termination, and dispute resolution.
• The contract is for a construction project
• The scope of work includes irrigation installation and backfilling
• The contract amount is $41,197.30
• The duration is 120 calendar days
• The contractor is required to pay prevailing wages
• The contract includes provisions for changes, termination, and dispute resolution