The contract involves the modernization of controls on Boiler B-1 at the Florida State University Central Utility Plant. The scope of work includes removing the existing controls and installing new controls with parallel positioning, linkage-less control, oxygen trim, feedwater level control, gas train, and custom-built panels with VFD. The contract was awarded to McCain Engineering Co. Inc. and Thermal Tech, Inc.
• The contract involves the removal of existing controls and installation of new controls.
• The scope of work includes parallel positioning, linkage-less control, oxygen trim, feedwater level control, gas train, and custom-built panels with VFD.
• The contract was awarded to two vendors: McCain Engineering Co. Inc. and Thermal Tech, Inc.
• The estimated completion time for the scope of work is 2-3 weeks.
• The contract includes training sessions for both day and night shifts.