The City of Richland is seeking bids for the WWTP Digester Facility Improvements & Standby Generator Replacement project. The project includes the replacement of existing electrical and HVAC equipment in the Digester Control Building and the replacement of the existing standby generator inside the Solids Handling Building with an outdoor unit. The estimated cost of the project is $1.5M. The contract was awarded to Vincent Brothers with a total base bid of $1,996,068.00.
• The project is estimated to cost $1.5M.
• The contract was awarded to Vincent Brothers.
• The project includes the replacement of existing electrical and HVAC equipment.
• The project includes the replacement of the existing standby generator.
• The bid contact is Sabrina Melendrez.