This small‑procurement contract tasked an engineering consulting firm with conducting pre‑design assessments of bulk‑fuel tank farms across eight remote Alaskan villages. The contractor was to review existing 2015 assessments, perform on‑site inspections, and produce both draft and final letter reports that include condition analyses, improvement alternatives, and rough order‑of‑magnitude cost estimates. The work was limited to a four‑month performance period (June–September 2017) with a total contract ceiling under $200 K. The award was made to LeMay Engineering & Consulting.
• Scope: site visits, fuel‑facility inspections, draft & final reports for eight villages (Group A & Group B).
• Deliverables: detailed assessments, cost estimates, schematics, photos, and recommendations.
• Timeline: proposals due June 8 2017; work performed June‑September 2017; final report due August 29 2017 (as corrected by Addendum 1).