Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Engineering Services
  5. ›Engineering Services - Sprague Trail Bridge Design / E.D.

Awarded contract·City of Worcester·Massachusetts

Engineering Services - Sprague Trail Bridge Design / E.D.

Won by Wright-Pierce$250kSingle Award
Contract source

Awarded vendors

  • Wright-Pierce

Description

The City of Worcester issued RFP 8396‑W5 for professional engineering services to design an accessible pedestrian bridge over Broad Meadow Brook as part of the Sprague Trail project. The scope includes kickoff meetings, site due‑diligence, field surveys, geotechnical investigations, structural and civil design deliverables, and storm‑water compliance, with all work to be completed by the end of 2025. The contract is a lump‑sum, full‑open‑competition solicitation, and Wright‑Pierce was selected as the most advantageous bidder. No construction or permitting responsibilities are included; the city will obtain construction cost estimates after design completion. • Required deliverables: sealed structural and civil drawings, topographic survey, geotechnical report, storm‑water checklist, and multiple revision cycles. • Project timeline: design start May 1 2025, design completion December 31 2025, with a 20 % design milestone due by June 30 2025. • Funding: MassTrails Grant (grant amount undisclosed).

Attached files

Key dates

Bids closed
4/9/2025
Contract modified
4/4/2025
Starts
5/1/2025
Ends
12/31/2025
Duration
8 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
8396-W5

Contract value

$250,000

The solicitation does not disclose a contract value. Comparable municipal bridge design contracts for a 35‑ft pedestrian bridge (including surveys, geotechnical report, structural and civil design, and multiple revision cycles) typically range from $150,000 to $300,000 depending on site complexity and local labor rates. Given the inclusion of extensive wetland‑adjacent design constraints, three revision cycles, and required storm‑water compliance, a reasonable midpoint estimate is roughly $250,000. This estimate assumes a professional‑services rate of $150‑$200 per hour for a small‑to‑medium engineering firm and a total effort of 1,250‑1,500 hours.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Cobb County, GA·Georgia

Top match · 76%

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Georgia Cobb County Department of Transportation·Georgia

75% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

Cobb County·Georgia

74% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Green Cove Springs·Florida

74% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Georgia Cobb County Department of Transportation·Georgia

73% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Minnesota Department of Administration·Minnesota

73% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

City of Laredo·Texas

72% match

FY27-ENG-007 - Recreational Trails Grant Program 2022 Shiloh Bike Trails – Emergency Towers and Bike Repair Stations - Engineering Department

Closes 11/6/2026Opened 10/22/2026

Nevada County·California

72% match

Rock Creek Road at Rock Creek Bridge – Engineering Design Services

Closes 11/30/2026Opened 10/15/2026

County of Marin·California

72% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

Georgia Cobb County Department of Transportation·Georgia

72% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Keene·New Hampshire

72% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Haines City·Florida

72% match

Boomerang Park Nature Trail Project - Design Services

Closes 11/10/2026Opened 10/9/2026

Maryland Department Of General Services·Maryland

72% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

City of Ormond Beach - Purchasing Office·Florida

71% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Pierce County·Washington

71% match

Pipeline Trail Phase 3 - Architecture and Engineering Services

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Agriculture·California

71% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Fort Myers·Florida

71% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026

Connecticut Town of Simsbury·Connecticut

71% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

City of Green Bay·Wisconsin

71% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Frontenac·Missouri

70% match

STP-5503(609) - Spoede Road Bridge Replacement

Closes 11/2/2026Opened 9/15/2026

U.S. Department Of Transportation·Washington

70% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

Kenosha County·Wisconsin

70% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Transportation, NYS Dept. of·New York

70% match

Design Services for Route 103 Over Erie Canal, Schenectady County, Region 1

Closes 11/10/2026Opened 10/20/2026

City of Flagstaff, AZ·Arizona

70% match

Professional Engineering Services for Lone Tree Road Feasibility Study, O'Leary St to J.W. Powell Blvd

Closes 11/12/2026Opened 9/25/2026

Glenn County Public Works Agency·California

70% match

Request For Proposals: Engineering, Surveying And Environmental Services County Road Z Angel Slough Bridge Project

Closes 11/19/2026Opened 10/14/2026