This contract is for a comprehensive HVAC retrofit of the Main Pump Building at the Rock River Water Reclamation District’s treatment plant in Rockford, Illinois. The work includes full roof removal and replacement with a TPO membrane, demolition of existing HVAC equipment, installation of new air‑handling units, supply/exhaust fans, a new direct‑digital‑control (DDC) system, upgraded lighting, and a new gas‑detection and fire‑alarm system. The contractor must also provide all related ductwork, insulation, fire‑stop work, operation‑and‑maintenance manuals, and as‑built drawings, and must meet extensive safety, environmental, and prevailing‑wage requirements.
• Scope covers demolition, roof replacement, HVAC equipment supply & install, controls, electrical upgrades, and commissioning.
• Schedule requires Substantial Completion by 16 Sep 2020 and Final Completion by 30 Oct 2020, with liquidated damages of $300 per day for late performance.
• Mandatory pre‑bid meeting, $50 bid‑document fee, 5 % bid bond, performance and labor‑material bonds, and a full suite of insurance and warranty documentation are required.