The contract is for storm repairs at San Simeon Creek MP 2.542, which includes road reconstruction, installation of rock slope protection, and slope repairs. The project aims to ensure safe passage by the public and emergency vehicles. The engineer's estimate for the project is $503,200.00. The contract was awarded to two vendors, David Crye General Engineering and Semair Construction, Inc.
• The project involves road reconstruction and installation of rock slope protection
• The project aims to ensure safe passage by the public and emergency vehicles
• The engineer's estimate for the project is $503,200.00
• The contract was awarded to two vendors, David Crye General Engineering and Semair Construction, Inc.