The contract is for main line lining for root mitigation, specifically for Project 5. The work includes cleaning, television inspection, and installation of cured-in-place pipe for various lineal feet of main line, as well as reinstatement of lateral taps and removal and replacement of flusher branches and lower laterals. The estimated construction cost is $1,245,000. The contract was awarded to Express Sewer & Drain, Inc. with a bid of $1,370,156.00.
• The contract requires a Class A - General Engineering Contractor license.
• The project involves multiple lineal feet of main line and lateral taps.
• The contract has a single award.
• The contract is for a construction project.
• The project has a specific scope of work, including cleaning, television inspection, and installation of cured-in-place pipe.