The contract is for the additions and renovations of Oscar Ortiz Park, located at 415 Mainer Rd, Robstown, TX 78380. The scope of work includes the demolition and replacement of restrooms and a 1-mile walking track, pre-engineered shade structure, with solar-power lighting of the new track and various ADA site upgrades. The contract is expected to be completed within 300 calendar days after the date of the Notice to Proceed for the Base Bid. The contract was bid on a lump sum basis, and the lowest bidder will be awarded the contract. Some of the key points of the contract include:
• The contract is for a fixed price, and the bidder must provide a lump sum bid.
• The contract includes a schedule of values, which must be broken down into itemized costs.
• The bidder must provide a bid bond, and the contract includes a provision for liquidated damages if the work is not completed on time.
• The contract includes provisions for the removal and disposal of demolished materials and debris.
• The contract includes provisions for the bidder to provide all necessary tools and equipment to complete the project.
• The contract includes provisions for the bidder to take proper care to avoid unnecessary noise, clatter, or obstructions in walkways, sidewalks, and roadways.