The contract is for the construction of approximately 4 miles of large diameter (66”) recycled water pipeline. The estimated contract cost is $58,000,000. The project requires a General Engineering Contractor, Class A license. The contract was awarded to Mountain Cascade, Inc., with a bid of $51,283,600. The scope of work includes the furnishing of all labor, materials, and equipment for the construction of the pipeline.
• The project is located in Elk Grove, California.
• The contract was bid on by five different vendors.
• The project requires a mandatory pre-bid conference and walk-through.
• The contract documents include specifications, drawings, and addenda.