The contract is for the Sunset Drive and S Ridgeview Road Water Main Replacement Project, Phase 2. The project involves the installation of approximately 2,080 linear feet of 12-inch HDPE water mains and associated valving and fire hydrants. The contract also includes two additive alternates for Ridgeway Drive and Central Street & Central Circle. The contract was awarded to Wiedenmann Inc. and Pyramid Excavation & Construction, Inc. The total price for the contract is $1,570,157.00 for the base bid and additive alternates. Key aspects of the project include:
• Installation of water mains and associated valving and fire hydrants
• Pipe bursting methods for installing HDPE water mains
• Removal and replacement of existing fire hydrant assemblies and valves
• Installation of gate valves and quick coupling control valves
• Connection to existing pipes and plugging of existing water mains
• Restoration of roundabouts and removal and replacement of concrete sidewalks, driveways, and curbs