The King County Library System is seeking a vendor to modernize the elevator at the Bellevue Library. The project involves the replacement of the existing elevator with a new one. The contract was awarded to Cascade Elevator, with a base bid of $132,500.00. The project is expected to be completed, but the exact timeline is not specified. Key aspects of the contract include the modernization of the elevator, the provision of a new elevator system, and the removal of the existing elevator. The contract also includes alternates, which are additional work items that may be required.
• The contract is for the modernization of the elevator at the Bellevue Library.
• The project involves the replacement of the existing elevator with a new one.
• The contract was awarded to Cascade Elevator, with a base bid of $132,500.00.
• The project is expected to be completed, but the exact timeline is not specified.
• The contract includes alternates, which are additional work items that may be required.