The Bryte Landfill Remediation Project involves the remediation of the former Bryte Landfill and the construction of a corrective action management unit (CAMU) to relocate waste from the former landfill property. The project includes excavating and hauling cover material and waste, excavation of sediment from a drainage canal, material placement in the CAMU, treatment of waste material to stabilize metals concentrations, compaction, and vegetation of CAMU cover. The former landfill property and canal will be backfilled, compacted, and vegetated. The construction cost is estimated to be $6,000,000.00. The project requires a pre-bid inspection and site visit, and bidders must submit their questions and correspondence to the designated contact.
• The project involves remediation of the former Bryte Landfill and construction of a CAMU.
• The project includes excavating and hauling cover material and waste, excavation of sediment from a drainage canal, and material placement in the CAMU.
• The project requires treatment of waste material to stabilize metals concentrations, compaction, and vegetation of CAMU cover.
• The former landfill property and canal will be backfilled, compacted, and vegetated.
• The construction cost is estimated to be $6,000,000.00.