The contract is for the rehabilitation of pipe culverts and storm drain segments at various locations throughout Carroll County, Maryland. The project involves cured-in-place pipe lining and all additional and incidental work as indicated in the specifications and special provisions. The cost estimate for the project is between $100,001 and $500,000. The contract was awarded to Abel Recon, LLC for a total amount of $345,135.90.
• The project requires pre-qualification with the Bureau of Engineering.
• The contract was awarded on June 13, 2018.
• The project involves the rehabilitation of pipe culverts and storm drain segments.
• The cost estimate for the project is between $100,001 and $500,000.
• The contract was awarded for a total amount of $345,135.90.