The contract is for the repair of the hydraulic passenger elevator at the Water Pollution Control Rock Creek Pump Station. The work includes draining and replacing the hydraulic fluid, replacing the packing, door rollers, spirator, and interlocks, installing a new high water alarm, and sanding and cleaning the rails and piston. The contract is a prevailing wage job, and the vendor must have a valid City of Independence business license and provide a current certificate of insurance and notarized affidavit of non-collusion.
* The elevator is located at 400 N. Kentucky Rd., Independence, MO 64053.
* The bid submission date was September 23, 2015.
* The contract was awarded to MEI Total Elevator Solutions.
* The total cost to repair the elevator as specified is $11,839.00.
* The estimated material lead time is 5 days.
* The estimated repair time is 4 hours.