This contract calls for a qualified contractor to provide comprehensive scaffolding services at the City of Spokane Waste‑to‑Energy Facility for both scheduled and emergency boiler outages. The contractor must deliver engineered scaffold designs, erect and dismantle scaffolding inside the plant’s boiler(s), mobilize a crew of at least six scaffolders (including two journeymen), and be able to complete boiler scaffolding within six hours of outage start. The scope includes mobilization/demobilization, hourly labor rates (standard, overtime, double‑time), per‑diem/hotel costs, and a 2.5‑hour local response requirement for Spokane‑based branches. The contract is a one‑year base period with the option for up to four one‑year extensions, a maximum estimated contract value of $450,000, and requires bid security, retainage, and compliance with prevailing‑wage, safety, and environmental regulations.
• Scaffold erection, maintenance, and removal for boiler‑outage work at the WTE facility
• Minimum crew: 2 journeymen + 4 scaffolders; 6‑hour completion window for boiler scaffolding
• Fixed‑price mobilization ($30,850) plus hourly labor rates; per‑diem $66/day + 5% travel surcharge
• Performance period: 4/1/2022‑3/31/2023, with up to four one‑year extensions