This contract awards the City of Dothan a turnkey solution to provide, install, test, and commission a permanent‑mounted backup generator for the Midtown Pump Station. The work includes supplying a generator set with NEMA 3R enclosure, fuel tank, automatic transfer switch, concrete foundation, fencing, site preparation, electrical wiring, and all required engineering sign‑offs. The award was granted to Palmer Electric for a lump‑sum price of $91,620 after a competitive bidding process that closed on July 30 2024. The project is expected to be completed under a single‑award, firm‑fixed‑price arrangement, with the city’s utilities department overseeing delivery and commissioning.
• Scope: design, supply, install, test, and commission a permanent backup generator system (generator, fuel tank, ATS, foundation, enclosure, wiring, and site work).
• Awarded Vendor: Palmer Electric (lowest bid, $91,620).
• Procurement: Full and open competition; award date 9 Sept 2024; purchase order issued 23 Aug 2024.