The contract is for the replacement of a septic system at 3643 Carper Ave, Akron, Ohio, as part of the Household Sewage Treatment System (HSTS) Program. The scope of work includes the installation of an NPDES compliant aerobic treatment unit, connection of downspouts, and pump crush and fill of the existing septic system. The contractor must also provide warranties and ensure compliance with local and state codes. The contract is subject to Davis Bacon wage rates.
• The contract requires the replacement of a septic system with an NPDES compliant aerobic treatment unit.
• The contractor must connect downspouts and pump crush and fill the existing septic system.
• The contractor must provide warranties and ensure compliance with local and state codes.
• The contract is subject to Davis Bacon wage rates.
• The contractor must attend a mandatory pre-bid meeting and visit the site prior to the meeting.
• The contractor must have a current registration, bond, and insurance on file with the appropriate jurisdictions.