The solicitation does not disclose a contract ceiling. A 3300 MBH natural‑gas condensing boiler (including equipment, removal, disposal, installation, controls, flue, testing, and balancing) typically ranges from $300,000 to $500,000 for equipment alone. Adding labor, mobilization, crane services, permitting, waste management, insurance, and overhead for a 90‑day campus project can add another $200,000–$300,000. Considering the university’s location, potential premium for MBE participation, and contingency, a reasonable ball‑park total contract value is **$800,000**. This estimate assumes a mid‑range equipment cost, standard labor rates for Maryland, and inclusion of all required ancillary services.