This contract is for the removal and replacement of a truck wash blower arch at the Toms River Vehicle Services location. The contract was awarded to J.A. Wig Const. & Electric, LLC for a total lump sum of $63,203.00. The scope of work includes the furnishing and installation of a new blower arch, as well as the removal of the existing one. The contract period is for one year, from December 18, 2024, to December 17, 2025.
• The contract includes the furnishing and installation of a Premier LSST200 - Double Leg Large Vehicle Arch
• The contract includes the furnishing and installation of four Premier LSS125 - 1SHP Producer units
• The contract includes the furnishing of two Premier LSS125-EVO - 1SHP Producer Evolution units
• The contract includes the furnishing of one set of Premier LUSSO-EVO - Evolution Air Knives
• The contract includes the furnishing of two sets of Premier LU545 - Elephant Trunks (nozzles and clamps)