Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arkansas
  4. ›Civil Engineering
  5. ›17-10-C1ː SSA Remedial Measures, Basin 12, Phase I

Awarded contract·City of Fort Smith·Arkansas

17-10-C1ː SSA Remedial Measures, Basin 12, Phase I

$2.2MSingle Award
Contract source

Description

This bid tabulation documents the competitive bids received for the City of Fort Smith’s Phase 1 remedial‑measure construction program in Basin 12 of its storm‑water and sanitary‑sewer system. The scope encompasses extensive civil‑engineering work, including utility trenching, concrete curb and gutter installation, manhole construction and rehabilitation, pipe installation, surface restoration, traffic control, and related site work. The bid package contains over 70 line‑item categories, each priced on a unit‑price basis, culminating in an aggregate bid of approximately $2.2 million after a $100 k adjustment. The city’s ordinance provides a 5 % preference to a locally‑resident firm, indicating a potential small‑business or local‑firm advantage in the award evaluation. No award or contract execution details are included. • 71 line‑item categories covering trenching, concrete structures, manholes, pipe installation, surface repairs, and traffic utilities. • Total bid amount (after $100 k deduction) ≈ $2,199,925.30. • Bid opening/tablulation meeting held on 12 April 2023 at 10:00 A.M.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237110
Solicitation №
17-10-C1

Contract value

$2,199,925

The bid tabulation lists an overall total of $2,299,925.30 with a $100,000 deduction, resulting in a final adjusted total of $2,199,925.30. No other financial adjustments, retainage, or change‑order provisions are noted. Therefore, the contract’s estimated value is roughly $2.2 million USD. This estimate assumes the awarded contract will be for the full scope represented in the bid tabulation, with no significant scope reductions or additional work beyond what is listed.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Veterans Affairs·New Hampshire

Top match · 66%

F108--Groundwater Remediation

Closes 11/12/2026Opened 10/27/2026

City of Stillwater·Oklahoma

66% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

Irvine Ranch Water District·California

66% match

Wells 6, 12, 14, and 15 Site Improvements

Closes 11/18/2026Opened 10/15/2026

Alaska Department of Environmental Conservation·Alaska

65% match

Aleutian Homes Phase VII Water and Sewer Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/17/2026

U.S. Department Of Defense·United States of America

65% match

ENVIRONMENTAL REMEDIATION SERVICES MULTIPLE AWARD TASK ORDER CONTRACT W912P9

Closes 11/12/2026Opened 10/28/2026

San Bernardino County·California

65% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

Inland Empire Utilities Agency·California

65% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

U.S. Department Of Defense·Missouri

65% match

SB ERS MATOC, USACE Northwestern Division and EPA Region 2

Closes 11/16/2026Opened 7/30/2026

U.S. Department Of Defense·California

65% match

Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per- and Polyfluoroalkyl Substances (PFAS)

Closes 11/30/2026Opened 10/28/2026

City of Hollywood·Florida

65% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Salina·Kansas

65% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

U.S. Department Of Defense·United States of America

65% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

City of Santa Rosa·California

65% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

City of Rockford·Illinois

65% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

City of Stockton·California

65% match

SOUTH POINTE ENVIRONMENTAL CLEANUP

Closes 11/19/2026Opened 10/22/2026

City of Waco·Texas

65% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Salina·Kansas

64% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Michigan Department of Environment, Great Lakes, and Energy·Michigan

64% match

761/19006.SAR; NuWay Cleaners Site - Remedial Excavation

Closes 11/18/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

64% match

Region 7 Southeast Mines Superfund Site

Closes 11/6/2026Opened 10/21/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

64% match

Request for Information – Sinkhole Remediation

Rolling / TBD closeOpened 5/13/2026

City of South San Francisco·California

64% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

City of Panama City·Florida

64% match

SRF Area P-12 Improvements

Closes 11/13/2026Opened 10/7/2026

U.S. Department Of Defense·Minnesota

64% match

Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands

Closes 11/11/2026Opened 10/29/2026

City of Albany·Georgia

64% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of Hollywood·Florida

64% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026