This solicitation sought a qualified engineering firm to provide full‑service design, planning, phasing, and construction oversight for the complete reconstruction of Taxiway Foxtrot at Clinton National Airport, a critical component supporting the primary commercial runway (4L‑22R). The scope includes compliance with FAA, federal, state, and local regulations, development of detailed construction drawings, environmental assessments, and coordination with airport operations.
• Engineering design services cover civil, structural, pavement, drainage, and utility design.
• Deliverables include phased construction plans, cost estimates, and bid package preparation.
• Contractor must incorporate mandatory federal provisions added via addenda and acknowledge all amendments.
Attached files
The award documents live at the source — open the contract source above to download them.