This contract is for drainage improvements in the Barwood Subdivision (2018) for Harris County Precinct 3. The scope of work includes upsizing the underground storm sewer in the subdivision to provide accommodation for increased conveyance to both HCFCD channels E13200-00 and E133-00-00. The contract was awarded to CE Barker Ltd for a total amount of $10,975,788. The project aims to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. Key features of the project include the installation of new storm sewer pipes, the construction of new manholes and junction boxes, and the relocation of existing utilities. The project is expected to have a significant impact on the community, providing improved drainage and reducing the risk of flooding. Some of the key points of this contract include:
• The contract was awarded to CE Barker Ltd for a total amount of $10,975,788.
• The project includes the installation of new storm sewer pipes, manholes, and junction boxes.
• The project aims to reduce flood risk and strengthen resiliency in Harris County.
• The project is expected to have a significant impact on the community, providing improved drainage and reducing the risk of flooding.
• The contract includes provisions for utility relocations, site restoration, and traffic control.