Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Oregon
  4. ›Construction
  5. ›Mead Building Condenser Pump Replacement

Awarded contract·Multnomah County·Oregon

Mead Building Condenser Pump Replacement

Won by Delta Connects Inc$125kSingle Award
Contract source

Awarded vendors

  • Delta Connects Inc

Description

The Mead Building Condenser Pump Replacement contract involves replacing the existing condenser water pumps with new base-mounted pumps and a parallel piping system at the Mead Building, located at 421 SE 5th Ave, Portland, OR 97204. The contract was awarded to Delta Connects Inc for $125,317.00 USD. The scope of work includes furnishing, removing the existing, and replacing the condenser water pump. The contract duration is approximately 1 year, from 7/15/2019 to 7/15/2020. Key points to consider include: • The contract requires the replacement of condenser water pumps with new base-mounted pumps and a parallel piping system. • The contract duration is approximately 1 year. • The contract was awarded to Delta Connects Inc for $125,317.00 USD. • The point-of-contact person is Brenda Caldwell, who can be reached at [email protected] or (503) 988-9398.

Attached files

Key dates

Ends
7/15/2020
Duration
1 year

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
238220
Solicitation №
RIB-247-2019

Contract value

$125,317

The contract value is explicitly stated as $125,317.00 USD. This amount is likely based on the scope of work, which includes replacing the condenser water pumps with new base-mounted pumps and a parallel piping system. The contract duration is approximately 1 year, which may also be a factor in determining the contract value.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Branson·Missouri

Top match · 69%

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

U.S. Department Of Veterans Affairs·Delaware

68% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

York County·Maine

68% match

HVAC System Upgrade- Courthouse Condenser Units

Closes 11/3/2026Opened 9/28/2026

Massachusetts Town of Westminster·Massachusetts

68% match

Library Boiler Replacement

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·North Carolina

67% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

University of Missouri-Kansas City·Missouri

67% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Coastal Carolina University·South Carolina

67% match

Singleton Energy Plant Boiler Replacement

Closes 11/5/2026Opened 10/13/2026

U.S. Department Of Veterans Affairs·California

67% match

Z1DA--FY27 NRM - Replace B98 and B88 Boiler and Sump Pumps

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·Maryland

67% match

NSWCCD York Chill Pump Replacement

Closes 11/16/2026Opened 10/26/2026

Omaha Public Schools·Nebraska

66% match

Marrs Cooling Tower Replacement

Closes 12/1/2026Opened 10/26/2026

North Carolina Cumberland County Engineering & Infrastructure Department·North Carolina

66% match

Cliffdale Library Boiler Replacement

Closes 11/4/2026Opened 10/7/2026

Massachusetts City of Haverhill·Massachusetts

66% match

South Mill Street Pump Station Header Piping Replacement

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Agriculture·Utah

66% match

ANF Duchesne Bunkhouse AC Replacement

Closes 11/13/2026Opened 10/29/2026

City of Chicago·Illinois

66% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Camden·South Carolina

66% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

City of Culver City·California

66% match

Municipal Plunge Equipment Repairs

Closes 11/19/2026Opened 10/22/2026

Mississippi State University·Mississippi

65% match

Trane Condenser, Evaporator Coil & TXV Replacement

Closes 11/3/2026Opened 10/14/2026

Town of Bridgton·Maine

65% match

RFPs Requested – Town Boiler System Replacement

Closes 11/10/2026Opened 10/14/2026

City of Dayton, Ohio·Ohio

65% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

University of Massachusetts System·Massachusetts

65% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of The Interior·South Dakota

65% match

Z--EROS Removal and replacement of chilled and conden

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Veterans Affairs·New York

65% match

Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT

Closes 11/11/2026Opened 10/29/2026

City of Redding·California

65% match

Overhaul of Two (2) Boiler Feedwater Pumps, Motors & Valves

Closes 12/4/2026Opened 10/26/2026

Nevada Adjutant General·Nevada

65% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

Sussex County·Delaware

65% match

Water Source Heat Pump Replacement

Closes 11/9/2026Opened 10/16/2026