This contract is for the replacement of a septic system at 2834 Kendall Rd. Copley, Ohio 44321. The contract was awarded to Summit Excavating, Inc. for $11,600.00. The project requires the installation of an NPDES compliant aerobic treatment unit, and the contractor is responsible for locating all water wells and ensuring that the existing septic is pumped, crushed, and filled according to state and local code. The contractor must also follow COVID protocols on the job site at all times. The key aspects of this contract include:
• Replacement of the septic system
• Installation of an NPDES compliant aerobic treatment unit
• Location of all water wells
• Pumping, crushing, and filling of the existing septic
• Following COVID protocols on the job site
This contract is subject to Davis Bacon wage rates, and the contractor must carry a minimum of $2,000,000.00 of General Commercial Liability Insurance and $1,000,000.00 of Commercial Auto Liability.