Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›SR 99 to Interstate 5/Metro Air Parkway Interchange…

Awarded contract·County of Sacramento - Construction·California

SR 99 to Interstate 5/Metro Air Parkway Interchange Northbound Auxiliary Lane Project

Won by George Reed, Inc. +8 more$3MMultiple Award
Contract source

Awarded vendors

  • George Reed, Inc.
  • Teichert Construction
  • DeSilva Gates Construction
  • Martin Brothers Construction
  • Bay Cities Paving and Grading, Inc.
  • O.C. Jones & Sons, Inc.
  • McGuire & Hester
  • Graniterock
  • Granite Construction

Description

The contract is for the construction of an auxiliary lane on Interstate 5 between the State Route 5/70/99 Separation and the Metro Air Parkway interchange. The project includes clearing and grubbing, pavement grinding, roadway excavation, erosion control, aggregate base, asphalt pavement, overhead sign construction, traffic striping, installation of metal beam guard rail, pipe culverts, lighting, and other work specified in the plans and specifications. The estimated construction cost is $3,000,000, and the contractor license required is General Engineering Contractor, Class A. • The contract was awarded to multiple vendors, with George Reed, Inc. being the apparent low bidder. • The project includes various components such as clearing and grubbing, pavement grinding, and asphalt pavement. • The contractor is required to have a General Engineering Contractor, Class A license. • The estimated construction cost is $3,000,000.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
4485

Contract value

$3,000,000

The estimated construction cost of the project is $3,000,000, as stated in the project description. This value is likely to be the total value of the contract, as it includes all the necessary components such as labor, materials, and equipment for constructing the auxiliary lane.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Maryland Transportation Authority·Maryland

Top match · 69%

I-95 / I-695 INTERCHANGE EXPRESS TOLL LANES – RAMPS MB & MH

Closes 1/13/2027Opened 10/10/2025

Santa Clara Valley Transportation Authority·California

68% match

US 101 Express Lanes Phase 5

Closes 11/12/2026Opened 9/21/2026

Minnesota Department of Transportation·Minnesota

68% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Panola County Board of Supervisors·Mississippi

68% match

Northwest Community College School of Aeronautics Taxilane Connector Project

Closes 11/3/2026Opened 10/12/2026

Bluewing Civil Consultants, LLC.·Louisiana

68% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

California Department of Transportation·California

67% match

SB Minor B-Install passageway for emergency vehicles-San Diego County

Closes 11/12/2026Opened 10/29/2026

Idaho Transportation Department·Idaho

67% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Massachusetts City of Brockton·Massachusetts

67% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Cincinnati·Ohio

67% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

NYS East Fishkill, Town of·New York

67% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

State of Delaware DOT·Delaware

67% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Municipality of Anchorage·Alaska

67% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

City of Austin·Texas

66% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Maryland State Highway Administration·Maryland

66% match

WA0925272 - I-81 (Maryland Veterans Memorial Highway) - Phase 2A from MD 63/MD 68 to I-70 6 Lane Divided Construct

Closes 12/3/2026Opened 10/27/2026

Loudoun County·Virginia

66% match

Route 15 North Widening: Battlefield Parkway to Montresor Road, IFB NG00004

Closes 11/20/2026Opened 10/13/2026

City of Cincinnati·Ohio

66% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Maryland State Highway Administration·Maryland

66% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Murfreesboro·Tennessee

66% match

Cherry Lane Extension, from east of I-840 to west of I-84 (New Interchange)

Closes 11/3/2026Opened 10/6/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

66% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

City of Charlotte·North Carolina

66% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

City of Torrance·California

66% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

City of Columbus·Ohio

66% match

Roadway - N Knot - 315 at Lane Avenue

Closes 11/4/2026Opened 10/2/2026

City of Perrysburg·Ohio

66% match

WOO SR 199-29.11 Louisiana Avenue

Closes 11/5/2026Opened 10/14/2026

City of Charlotte·North Carolina

66% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

65% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026