The County of Sacramento is seeking bids for the construction of approximately 4,300 square feet of composite liner system and 320 feet of 48-inch diameter stormwater piping at the Kiefer Landfill. The project includes furnishing all labor, materials, and equipment for the construction. A pre-bid conference was held on February 9, 2016, and the bid submission deadline was February 25, 2016. The contract was awarded to the apparent low bidder, Caggiano General Engineering, with a bid price of $193,081.35. Key aspects of the project include:
• Construction of composite liner system and stormwater piping
• Furnishing all labor, materials, and equipment
• Pre-bid conference held on February 9, 2016
• Bid submission deadline was February 25, 2016
• Contract awarded to Caggiano General Engineering with a bid price of $193,081.35