The contract is for the construction of the Foothill Water Treatment Plant #2 Improvements – Package 3. The project includes the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of process improvements, including demolition and removal of existing systems, installation of new systems, and replacement of an existing chemical storage tank. The estimated cost of construction is $3,500,000, and the total contract time is 385 calendar days. The contract was awarded to Cushman Contracting Corporation, who submitted the lowest bid price of $1,700,000.
• The contract requires the contractor to possess a valid State of California Class A- General Engineering Contractor’s License.
• A mandatory pre-bid walk-through meeting was held on January 4, 2017.
• The contract documents include plans and specifications prepared by HDR Engineering.
• The contract has a bid tabulation sheet that lists the bid prices of all bidders.