The Rum River Campus Decentralization – Cronin Building Project involves replacing the existing boiler(s) according to the specifications in the attached bid package. The project is located at the Rum River Human Services Center Campus in Anoka, MN. The bid was awarded to two vendors: Morcon and Versacon, with bids of $329,025.00 and $340,000.00, respectively.
• The project requires the replacement of the existing boiler(s) per the specifications in the attached bid package.
• The bid was awarded to two vendors: Morcon and Versacon.
• The project is located at the Rum River Human Services Center Campus in Anoka, MN.
• A pre-bid conference was held on February 7, 2023, at 11:00 AM EST.
• The bid submission date was February 22, 2023, at 4:00 PM EST.