The Summit County CBCF Roof Top HVAC Unit Replacement Project involves the replacement of 28 roof top HVAC units at the Men's and Women's Community Based Correctional Facilities. The project has an estimated cost of $258,000. The contract was awarded to multiple vendors, including FM International, S.A. Comunale Co., Inc., and others. The scope of work includes the installation of new HVAC units as shown on the drawings and specifications. The contract requires the vendors to upload a copy of their bid bond or cashier's check and accept all required documents before responding to the bid.
• The project requires the replacement of 28 roof top HVAC units.
• The estimated cost of the project is $258,000.
• The contract was awarded to multiple vendors.
• The scope of work includes the installation of new HVAC units as shown on the drawings and specifications.
• The contract requires the vendors to upload a copy of their bid bond or cashier's check and accept all required documents before responding to the bid.