This contract concerns the upgrade of the secondary electrical systems at the Hartford Water Pollution Control Facility (HWPCF). The scope includes all labor, equipment, permits, and related costs required to modernize the electrical infrastructure supporting secondary treatment processes, as detailed in Section 01010 of the bid documents. A mandatory pre‑bid conference and site tour were required, with the conference held on 15 Feb 2023 at the MDC Pre‑Bid Conference Room and the site tour at 240 Brainard Road. Bids were due 23 Mar 2023, and the award is scheduled for 12 Dec 2024. The project will be funded by the Metropolitan District Commission and will be executed at the HWPCF in Hartford, CT.
• Electrical system refurbishment for secondary treatment plant
• Mandatory pre‑bid conference and site tour attendance required for all bidders
• Full‑open sealed‑bid competition (ITB) with award anticipated in December 2024
• Work includes labor, equipment, permits, and associated accessories
• Project located in Hartford, Connecticut, overseen by the Metropolitan District Commission
Attached files
The award documents live at the source — open the contract source above to download them.