This contract awards professional planning, engineering, surveying, and design services for the Fish Lake Trail Connection Study, linking Fish Lake Trail to the Centennial Trail in Spokane, WA. The work is divided into two phases: (1) feasibility, right‑of‑way, and preliminary design including public outreach and environmental permitting; and (2) detailed design up to 60 % completion, including surveys, geotechnical work, and preparation of design plans. The city expects a $200 k budget funded by a Federal Highway Administration Transportation Alternatives grant, with a mandatory 9 % Under‑Utilized Business Enterprise participation goal and compliance with extensive federal, state, and local regulations. The contract runs from early January 2020 through late May 2021, with the possibility of up to four one‑year extensions.