The contract is for the AC Water Main Replacement 2021, Phase 2 project, which involves constructing approximately 9,230 LF of ductile iron water mains, installing new fire hydrant assemblies, and other related work. The engineer's estimate for the project is $4,550,204.54. The contract was awarded through a public bid process, and the top bidders are listed as Fury Site Works, Kar-Vel Construction, and Pivetta Brothers Construction.
• The project includes constructing a replacement 6” x 2” Pressure Reducing Station in concrete vault
• Constructing approximately 290 LF of PVC drain pipe
• Construction dewatering
• Relocating existing utilities (as required)
• Abandoning asbestos cement pipe
• Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks
• Performing traffic control
• Other work as required to complete the project.